EVALUASI PURNA HUNI STADION SULTAN AGUNG BANTUL MANAJEMEN PEMELIHARAAN BANGUNAN

Authors

  • Syaiful Arifin Program Studi Arsitektur, Fakultas Sains dan Teknologi, Universitas Teknologi Yogyakarta, Indonesia
  • Hestin Mulyandari Program Studi Arsitektur, Fakultas Sains dan Teknologi,Universitas Teknologi Yogyakarta, Indonesia

DOI:

https://doi.org/10.31101/juara.v2i1.1000

Keywords:

POE, building maintenance

Abstract

Sultan Agung Bantul Stadium is a sport area in Bantul Regency, but it is rather poorly maintained. The Post Occupancy Evaluation (POE) aims to know about problems that cause the poor condition of the building to support sports activities. The method uses a descriptive research in the form of evaluation of habitation. This method is an explanation of the data that has been collected that is supported and applied to existing theories. The collection of data with a survey on the environment Sultan Agung Stadium and collecting data from the government as a guide in designing. However, an analysis of the Building Maintenance Management of this stadium is also needed. In the design department Sultan Agung Stadium in Bantul district has a lot of potential that can be developed as a sport.

References

Danisworo, M. 1989. Post Occupancy Evaluation: Pengertian dan Metodologi. Dalam Makalah Seminar Pengembangan Metodologi Post Occupancy Evaluation. Jakarta: Usakti.

Mulyandari, Hestin. & Saputra R.A., 2011. Pemeliharaan Bangunan : Basic Skill Facility Management. Yogyakarta: Andi Yogyakarta.

Preiser, W. F. E. Rabinowitz, H.Z, dan White, E.T. (1988). Post-Occupancy Evaluation. New York: Van Nostrand Reinhold Company.

Sudibyo,S. 1989. Aspek Fungsi dan Teknis Post Occupancy Evaluation dan Beberapa Metodologi Penelitian. Jakarta: Usakti

Published

2019-02-13

How to Cite

Arifin, S., & Mulyandari, H. (2019). EVALUASI PURNA HUNI STADION SULTAN AGUNG BANTUL MANAJEMEN PEMELIHARAAN BANGUNAN. Jurnal Arsitektur Dan Perencanaan (JUARA), 2(1), 17–29. https://doi.org/10.31101/juara.v2i1.1000

Citation Check